Raises the cradle off of the dockable tabletop for service.
Prerequisites
| Personnel requirements |
|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
|---|
| 2 | - | 15 minutes | - |
| Tools and test equipment |
|---|
| Item | Quantity | Part number | Manufacturer |
|---|
| Nonmagnetic Titanium Service Tool Kit, Small Set | 1 | 5113258 | - |
| Support Pad (recommended size: 6 cm x 10 cm x 20 cm) | 2 | 5779362 | - |
| Required conditions |
|---|
| The posterior array coil is removed. |
Procedure
- Remove the two screws and two washers securing the cradle to tabletop.
Figure 1. Cradle hardware
- Lift up the cradle and place a support pad under each end.
Figure 2. Support pads