- SIGNA™ Hero 3.0T Service Methods
- 5852800-8EN Revision 1.0
- 00000018WIA30025E40GYZ
- id_20198561.6
- Sep 19, 2019 1:41:28 PM
Replacing the dockable table motor
Removes the longitudinal movement motor from the dockable table and installs a replacement motor.
Prerequisites
| Personnel requirements | |||
|---|---|---|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
| 1 | - | 100 minutes | - |
| Tools and test equipment | |||
|---|---|---|---|
| Item | Quantity | Part number | Manufacturer |
| Stainless Steel Ruler | 1 | 46-198452P2 | - |
| Tension Meter Tool *Included in the Dockable Table Motor FRU Kit | 1 | 5834577 | - |
| Nonmagnetic Titanium Service Tool Kit, Small Set | 1 | 5113258 | - |
| Consumables | |||
|---|---|---|---|
| Item | Quantity | Part number | Manufacturer |
| Loctite #243 | As needed | 5415261-3 | - |
| Replacement parts | |||
|---|---|---|---|
| Item | Quantity | Part number | Manufacturer |
| Dockable Table Motor FRU Kit *Kit includes:
| 1 | 5819402 | - |
| Safety |
|---|
|
Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:
If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed. |