Replacing the table dock cables

Replaces the dock cables for the dockable patient table.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
2-4 hours -
Tools and test equipment
ItemQuantityPart numberManufacturer
Nonmagnetic Titanium Service Tool Kit, Large Set15112581-
Consumables
ItemQuantityPart numberManufacturer
Self-locking Cable TieAs needed46-208758P5-
Replacement parts
ItemQuantityPart numberManufacturer
PE Cable, Dock Side15946430-
P1 Cable - Dock Side - Motus 1.5T (Also applicable to 3T)15946331-
P2 Cable, Dock Side, No MNS15946432-20-
P3 Cable Track for Motus 1.5T Dock Side (Also applicable to 3T)15946333-
P4 Cable - Dock Side - Motus 1.5T (Also applicable to 3T)15946334-
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.

About this task

Refer to SIGNA Hero System Wiring Diagrams (5852804-8EN) for cable connection details.

Procedure

Undock the patient table and remove it from the magnet room.