- SIGNA™ Hero 3.0T Service Methods
- 5852800-8EN Revision 1.0
- 00000018WIA3068E030GYZ
- id_123746331.27
- Oct 11, 2021 3:47:43 PM
Replacing the hydraulic rotary pump
Replaces the hydraulic rotary pump of the dockable patient table.
Prerequisites
| Personnel requirements | |||
|---|---|---|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
| 1 | - | 90 to 105 minutes | - |
| Tools and test equipment | |||
|---|---|---|---|
| Item | Quantity | Part number | Manufacturer |
| Nonmagnetic Titanium Service Tool Kit, Large Set | 1 | 5112581 | - |
| 11/16 inch Open-End Wrench | 2 | - | - |
| 7/8 inch Open-End Wrench | 1 | - | - |
| Needle-Nose Pliers | 1 | - | - |
| Slotted Screwdriver | 1 | - | - |
| Consumables | |||
|---|---|---|---|
| Item | Quantity | Part number | Manufacturer |
| Loctite #242 | 50 cc bottle | - | - |
| Absorbent Towels | As needed | - | - |
| Hose Clamp | 1 | 46-317179P1 | - |
| Replacement parts | |||
|---|---|---|---|
| Item | Quantity | Part Number | Manufacturer |
| Patient Table Hydraulic Rotary Pump Assembly | 1 | 5341568 | - |
| Required conditions |
|---|
| Table bellows must be raised. |
| Lower base side covers must be removed. |
| Safety | ||||
|---|---|---|---|---|
|
Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:
If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed. | ||||
| ||||
Procedure
- Undock the patient table.
- Remove the patient table from the magnet room.