• SIGNA™ Hero 3.0T Service Methods
  • 5852800-8EN Revision 1.0
  • Object ID: 00000018WIA30D01450GYZ
  • Topic ID: id_2021721 Version: 1.3
  • Date: Jan 17, 2020 5:34:29 PM

Replacing table dock components

Procedures for replacing field replaceable units contained within the table dock.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
2-4 hours and 30 minutes to 5 hours and 5 minutes-
Tools and test equipment
ItemQuantityPart numberManufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set15113258-
Consumables
ItemQuantityPart numberManufacturer
Permatex (1 oz tube) Antiseize LubricantAs required2119594-
Loctite #243As required5415261-3-
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.