• SIGNA™ Hero 3.0T Service Methods
  • 5852800-8EN Revision 1.0
  • Object ID: 00000018WIA30B90450GYZ
  • Topic ID: id_2021616 Version: 1.2
  • Date: Nov 15, 2019 3:52:27 PM

Replacing the dockable table dummy load

Removes the dummy load from the dockable table and installs a replacement dummy load.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-80 minutes-
Tools and test equipment
ItemQuantityPart numberManufacturer
Nonmagnetic Titanium Service Tool Kit, Large Set15112581-
Replacement parts
ItemQuantityPart numberManufacturer
Dummy Load (50Ω Power Termination, 75W, BNC)15115270-
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.