Removes the P1/PE cable assembly from the dockable patient table and installs a replacement cable assembly.
Prerequisites
| Personnel requirements |
|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
|---|
| 2 | - | 8 hours | - |
| Tools and test equipment |
|---|
| Item | Quantity | Part number | Manufacturer |
|---|
| Nonmagnetic Titanium Service Tool Kit, Small Set | 1 | 5113258 | - |
| Consumables |
|---|
| Item | Quantity | Part number | Manufacturer |
|---|
| 7.31 x 0.184 Self-Locking Cable Tie | As required | 46-208758P3 | - |
| Replacement parts |
|---|
| Item | Quantity | Part number | Manufacturer |
|---|
| 3T P1/P3/PE Cable Track Assembly | 1 | 5807539-22 | - |