• SIGNA™ Hero 3.0T Service Methods
  • 5852800-8EN Revision 1.0
  • Object ID: 00000018WIA30337E40GYZ
  • Topic ID: id_2020279 Version: 2.1
  • Date: Dec 13, 2019 10:41:40 AM

Replacing the primary latch assembly

Removes the primary latch assembly from the dockable table and installs a replacement primary latch assembly.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-2 hours and 20 minutes5 minutes
Tools and test equipment
ItemQuantityPart numberManufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set15113258-
Stainless Steel Ruler146-198452P2
Consumables
ItemQuantityPart numberManufacturer
Loctite #243As required5415261-3-
Replacement parts
ItemQuantityPart numberManufacturer
Primary Latch Assembly15796734-
Required conditions
Table is undocked and away from the magnet.
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.

Procedure

Undock the table and move it away from the magnet. If possible, move it out of the scan room.