• SIGNA MR355 / SIGNA MR360
  • Service Manual
  • 5856356-3EN Revision 5.0
  • Basic Service Documentation. Copyright General Electric Company.
  • Object ID: 00000018WIA306A0030GYZ
  • Topic ID: id_13106438 Version: 4.0
  • Date: Feb 26, 2021 3:42:04 AM

Replacing the Integrated Control Engine (ICE) fan assembly

Removal and installation instructions for replacing the Integrated Control Engine (ICE) fan assembly in the Integrated System Cabinet (ISC).

Prerequisites

The following tables represent a comprehensive roll-up of the personnel, time, tools, test equipment, and replacement parts you need to complete all possible tasks in this procedure.

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-15 minutes15 minutes
Tools and test equipment
ItemQuantityPart numberManufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set1 Kit5113258-
Nonmagnetic Titanium Service Tool Kit, Large Set5112581-
Replacement parts
ItemQuantityPart numberManufacturer
2 -
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.

Note: The ICE unit can be withdrawn with a slide rail.