• Topic ID: id_13106438
  • Version: 3.0
  • Date: Dec 6, 2019 3:17:02 AM

Replacing the Integrated Control Engine (ICE) fan assembly

Removal and installation instructions for replacing the Integrated Control Engine (ICE) fan assembly in the Integrated System Cabinet (ISC).

Prerequisites

The following tables represent a comprehensive roll-up of the personnel, time, tools, test equipment, and replacement parts you need to complete all possible tasks in this procedure.

Personnel requirements
Required persons Preliminary requirements Procedure Finalization
1 - 15 minutes 15 minutes
Tools and test equipment
Item Quantity Part number Manufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set 1 Kit 5113258 -
Nonmagnetic Titanium Service Tool Kit, Large Set 5112581 -
Replacement parts
Item Quantity Part number Manufacturer
ICE Fan Assembly 2 Refer to FRU Manual -
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.

  • danger
  • Electrocution hazard
  • Hazardous voltage is present when the cabinet is energized.
  • Before beginning any work, perform LOTO. See the MR Service Safety Manual (5452735).
note: The ICE unit can be withdrawn with a slide rail.