• Topic ID: id_2012603
  • Version: 4.1
  • Date: Jan 14, 2020 9:43:54 PM

Replacing the ICN power supply

This procedure describes the process of replacing the power supply in ICN.

Prerequisites

Personnel requirements
Required persons Preliminary requirements Procedure Finalization
1 10 minutes 30 minutes 20 minutes
Tools and test equipment
Item Quantity Part number Manufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set 1 5113258 -
Replacement parts
Item Quantity Part number Manufacturer
ICN power supply 1 5931100-21 -
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.

  • danger
  • Electrocution hazard
  • Hazardous voltage is present when the cabinet is energized.
  • Before beginning any work, perform LOTO. See the MR Service Safety Manual (5452735).