• Topic ID: id_12373966
  • Version: 1.9
  • Date: Oct 1, 2019 1:27:10 PM

Replacing the KASC terminator

Replace the KASC terminator in the Integrated System Cabinet (ISC).

Prerequisites

Personnel requirements
Required persons Preliminary requirements Procedure Finalization
1 - 30 minutes -
Replacement parts
Item Quantity Part number Manufacturer
KASC Terminator 1 2329754 -
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.

Notice Image
  • caution
  • Premature ICN failure
  • Failure to properly power down an ICN can result in premature ICN failure.
  • Never turn an ICN ON/OFF from the power button on the front. The ICNs have software running on disk drives that can be corrupted if not shut down properly. Follow the procedure for removing power to the ICN chassis.