• Topic ID: id_2012033
  • Version: 3.0
  • Date: Dec 18, 2019 2:57:07 AM

Finalizing the Integrated Control Engine (ICE) fan assembly replacement

This procedure finalizes the Integrated Control Engine (ICE) fan assembly replacement.

Prerequisites

Personnel requirements
Required persons Preliminary requirements Procedure Finalization
1 - 15 minutes -

Procedure

  1. Perform a TPS Reset, and then do a check scan to make sure the system operates correctly.