- SIGNA™ Hero 3.0T Service Methods
- 5852800-8EN Revision 1.0
- 00000018WHA30DF62GYZ
- id_20014997.22
- Oct 25, 2021 4:09:21 PM
Starting the coil datapath diagnostic
Diagnose the datapath connection for the coil by testing the connections between the P-coil connectors and the Digitized Per Pin Remote Receiver (DPP RRx) modules, between the PA port E connectors and the DPP RRx modules, and between the optional Multi-Nuclear Spectroscopy (MNS) frequency converter and the DPP RRx module if installed.
About this task

| Connection point locations | |
|---|---|
| Callout | Connection points |
| 1 | P1 (16 channel) |
| 2 | P2 (32 channel) |
| 3 | PA Port E (32 channel); connection points C1, C2, C3 |
| 4 | P4 (16 channel) |
| 5 | DPP RRx1 |
| 6 | DPP RRx2 |
| 7 | DPP RRx3 |

Choose which sub-procedure to use according to which connection path you want to test: