• Topic ID: id_15271105
  • Version: 3.0
  • Date: Aug 29, 2019 1:34:34 AM

Front Cover Removal and Installation

Prerequisites

Table 1 Personnel requirements
Required persons Preliminary requirements Procedure Finalization
1 - 15 minutes for front cover; 30 minutes for GEM light strips 15 minutes
Table 2 Tools and test equipment
Item Quantity Effectivity Part number Manufacturer
Cut-Resistant Gloves 1 Pair - - -
Non-Magnetic Service Tool Kit - -

5112581

-
Table 3 Replacement parts
Item Quantity Effectivity Part number Manufacturer
Front Cover 2 -

See FRU manual

-
Table 4 Safety
  • danger
  • Strong Magnetic Field!
  • Ferrous materials can become dangerous projectiles in the presence of the magnetic field Produced by the Magnet.
  • Do not Bring any ferromagnetic tools or equipment into the magnet room.

Overview

This document contains the procedures for front cover removal and installation. The front covers consist of two halves and contain the emergency stop and control panels for the system.

Preliminary

Procedure

  1. Turn off and perform LOTO on the RF and PEN cabinets. See the MR Service Safety Manual, PN 5452735.
  2. Undock the patient table and position the table away from the magnet.

Finalization

Procedure