- id_2011281
- Version: 3.0
- Date: Dec 18, 2019 3:05:50 AM
Removing the Integrated Control Engine (ICE)
Removing the Integrated Control Engine (ICE) from the System Cabinet.
Prerequisites
| Personnel requirements | |||
|---|---|---|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
| 1 | - | 30 minutes | - |
| Tools and test equipment | |||
|---|---|---|---|
| Item | Quantity | Part number | Manufacturer |
| Nonmagnetic Titanium Service Tool Kit, Small Set | 1 Kit | 5113258 | - |
| Nonmagnetic Titanium Service Tool Kit, Large Set | 5112581 | - | |
Procedure
- Remove the ICE as follows:
- Press the release tabs in on each side and pull the ICE forward.note: Hold the ICE carefully when you remove it so that it does not fall.
- Detach the slide rails from the ICE High Level Assembly (HLA) and install them to the new FRU.
Figure 1. Slide rails