• Topic ID: id_2011281
  • Version: 3.0
  • Date: Dec 18, 2019 3:05:50 AM

Removing the Integrated Control Engine (ICE)

Removing the Integrated Control Engine (ICE) from the System Cabinet.

Prerequisites

Personnel requirements
Required persons Preliminary requirements Procedure Finalization
1 - 30 minutes -
Tools and test equipment
Item Quantity Part number Manufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set 1 Kit 5113258 -
Nonmagnetic Titanium Service Tool Kit, Large Set 5112581 -

Procedure

  1. Remove the ICE as follows:
    1. Press the release tabs in on each side and pull the ICE forward.
      note: Hold the ICE carefully when you remove it so that it does not fall.
    2. Detach the slide rails from the ICE High Level Assembly (HLA) and install them to the new FRU.

      Figure 1. Slide rails