- id_2011280
- Version: 3.0
- Date: Dec 18, 2019 3:05:48 AM
Installing the Integrated Control Engine (ICE)
Install the Integrated Control Engine (ICE) in the System Cabinet.
Prerequisites
| Personnel requirements | |||
|---|---|---|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
| 1 | - | 30 minutes | - |
| Tools and test equipment | |||
|---|---|---|---|
| Item | Quantity | Part number | Manufacturer |
| Nonmagnetic Titanium Service Tool Kit, Small Set | 1 Kit | 5113258 | - |
| Nonmagnetic Titanium Service Tool Kit, Large Set | 5112581 | - | |
| Replacement parts | |||
|---|---|---|---|
| Item | Quantity | Part number | Manufacturer |
| ICE | 1 | Refer to FRU manual | - |
Procedure
- Restore the ICE by reverse order.
Figure 1. Power plug near Ethernet bracket

Figure 2. Cables next to the chassis
note: Restore the cables as shown below. J numbers in orange need to be reconnected.