• Topic ID: id_12374485
  • Version: 1.5
  • Date: Feb 4, 2020 3:24:03 PM

Replacing table undock mechanism components

Removes the undock link and lever from the table base and installs replacement components.

Prerequisites

Personnel requirements
Required persons Preliminary requirements Procedure Finalization
1 - 60 minutes -
Tools and test equipment
Item Quantity Part number Manufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set 1 5113258 -
Consumables
Item Quantity Part number Manufacturer
3.6 inch Cable Tie 1 46-208758P1 -
Replacement parts
Item Quantity Part number Manufacturer
Link Undock 1 5167918 -
Lever 1 5184060 -
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.