• Topic ID: id_12374584
  • Version: 2.0
  • Date: Oct 9, 2019 5:07:23 PM

Replacing the secondary latch actuating cable

Prerequisites

Personnel requirements
Required persons Preliminary requirements Procedure Finalization
1 - 60 minutes -
Tools and test equipment
Item Quantity Part number Manufacturer
Nonmagnetic Titanium Service Tool Kit, Large Set 1 5112581 -
Replacement parts
Item Quantity Part number Manufacturer
Secondary Latch Actuating Cable (cut to 1000 mm in length) 1 46-256080P1 -
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.