• Topic ID: id_12374015
  • Version: 1.7
  • Date: Mar 3, 2020 12:42:30 PM

Replacing table electrical docking mechanism components

Removes table components related to electrical docking and installs replacement components.

Prerequisites

Personnel requirements
Required persons Preliminary requirements Procedure Finalization
1 - 60 minutes -
Tools and test equipment
Item Quantity Part number Manufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set 1 5113258 -
Replacement parts
Item Quantity Part number Manufacturer
Link Bar Connector Pedal 1 5174518 -
Link Rod Connector 2 5769330 -
Shaft Rocker 2 5147700-2 (GEM)

5147700 (Non-GEM)

-
Rocker Clamp 2 5392170 (GEM)

5147701 (Non-GEM)

-
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.