- SIGNA MR355 / SIGNA MR360
- Service Manual
- 5856356-3EN Revision 5.0
- Basic Service Documentation. Copyright General Electric Company.
- 00000018WIA30DFB230GYZ
- id_156673231.8
- Jul 5, 2019 5:47:15 PM
Replacing the Global Operator Cabinet (GOC) Power Distribution Unit (PDU)
Removal and installation instructions for replacing the Power Distribution Unit (PDU) in the Global Operator Cabinet (GOC).
Prerequisites
| Personnel requirements | |||
|---|---|---|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
| 1 | - | 45 minutes | 30 minutes |
| Safety |
|---|
|
Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:
If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed. |
