Prerequisites
Table 1. Personnel requirements| Required persons | Preliminary requirements | Procedure | Finalization |
|---|
| 1 | Not Applicable | 30 per each one minutes | 30 minutes |
Table 2. Tools and test equipment| Item | Quantity | Effectivity | Part number | Manufacturer |
|---|
| Standard Tool | 1 | - | - | - |
Table 3. Replacement parts| Item | Quantity | Effectivity | Part number | Manufacturer |
|---|
| Temperature
& Humidity Sensor (Refer to Illustrated part manual) | 1 | - | - | - |
Table 4. Safety
| DANGER |
|---|
 | FATAL ELECTRIC SHOCK HAZARD!
TO PREVENT POSSIBLE FATAL ELECTRIC SHOCK, Shutdown the
Host computer and perform Lockout/Tagout of the GOC BEFORE STARTING THIS
PROCEDURE. |
|
About this task
Temperature & Humidity Sensors are installed to GOC and
System Cabinet.