• SIGNA™ Hero 3.0T Service Methods
  • 5852800-8EN Revision 1.0
  • Object ID: 00000018WIA30421730GYZ
  • Topic ID: id_2012033 Version: 3.2
  • Date: Oct 8, 2021 4:39:14 PM

Finalizing the Integrated Control Engine (ICE) fan assembly replacement

This procedure finalizes the Integrated Control Engine (ICE) fan assembly replacement.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-15 minutes-

Procedure

  1. Restore the power. See LOTO for ISC.
  2. Run ICE Board Level Diagnostics to ensure proper functionality.
  3. Do a Doing a check scan.