• SIGNA™ Hero 3.0T Service Methods
  • 5852800-8EN Revision 1.0
  • Object ID: 00000018WIA30D37640GYZ
  • Topic ID: id_2014513 Version: 1.5
  • Date: Oct 7, 2021 2:45:24 PM

Finalizing the head and body Tx cable replacement

This procedure finalizes the head and body Tx cable replacement.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-15 minutes-

Procedure

  1. Restore power. See LOTO for ISC.
  2. Do a Dual drive quadrature tool.
  3. Do a Check Scan.