- SIGNA™ Hero 3.0T Service Methods
- 5852800-8EN Revision 1.0
- 00000018WIA300D7640GYZ
- id_20145944.2
- Oct 8, 2021 4:35:52 PM
Finalizing the Integrated Control Engine (ICE) replacement
This procedure finalizes the Integrated Control Engine (ICE) replacement.
Prerequisites
| Personnel requirements | |||
|---|---|---|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
| 1 | - | 15 minutes | - |
Procedure
- Restore the power. See LOTO for ISC.
- Run ICE Board Level Diagnostics to ensure proper functionality.
- Do a Doing a check scan.