Finalization steps after replacing the egress switch and springs.
Prerequisites
| Personnel requirements |
|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
|---|
| 1 | - | - | 15 minutes |
| Tools and test equipment |
|---|
| Item | Quantity | Part number | Manufacturer |
|---|
| Nonmagnetic Titanium Service Tool Kit, Small Set | 1 Kit | 5113258 | - |
Procedure
- Dock the table both mechanically and electrically.
- Move the cradle toward the bore a minimum of 750 mm.
- Activate the egress switch so that the cradle comes out of the bore, initially at a high speed, and then ramps down to the regular home speed.
If the egress switch does not activate or does not move the cradle out from the bore, repeat the replacement procedure.