• SIGNA™ Hero 3.0T Service Methods
  • 5852800-8EN Revision 1.0
  • Object ID: 00000018WIA3063CB30GYZ
  • Topic ID: id_2012603 Version: 5.2
  • Date: Jul 13, 2021 4:16:32 PM

Replacing the ICN power supply

This procedure describes the process of replacing the power supply in ICN.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
110 minutes30 minutes20 minutes
Tools and test equipment
ItemQuantityPart numberManufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set15113258-
Replacement parts
ItemQuantityPart numberManufacturer
ICN power supply15931100-21-
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.