• SIGNA™ Hero 3.0T Service Methods
  • 5852800-8EN Revision 1.0
  • Object ID: 00000018WIA30425510GYZ
  • Topic ID: id_2004683 Version: 3.4
  • Date: Jan 24, 2022 8:57:06 PM

Installing the cabinet monitor

Installs the cabinet monitor into the Integrated System Cabinet (ISC).

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-15 minutes-
Tools and test equipment
ItemQuantityPart numberManufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set15113258-

Procedure

  1. Install the cabinet monitor into the ISC.
    Figure 1. Cabinet monitor 3 ISR
    1Cabinet monitor
    2Captive fasteners
  2. Tighten the captive fasteners securing the monitor to the cabinet.
  3. Connect the cables to the appropriate ports on the front of the cabinet monitor.
  4. Install the top cable bracket into the ISC.
    Figure 2. ISC top cable bracket
    1Top cable bracket
    2Screws
  5. Install the four screws securing the top cable bracket to the ISC.
  6. Close the ISC doors.