Installs the cabinet monitor into the Integrated System Cabinet (ISC).
Prerequisites
| Personnel requirements |
|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
|---|
| 1 | - | 15 minutes | - |
| Tools and test equipment |
|---|
| Item | Quantity | Part number | Manufacturer |
|---|
| Nonmagnetic Titanium Service Tool Kit, Small Set | 1 | 5113258 | - |
Procedure
- Install the cabinet monitor into the ISC.
Figure 1. Cabinet monitor 3 ISR

| 1 | Cabinet monitor |
| 2 | Captive fasteners |
- Tighten the captive fasteners securing the monitor to the cabinet.
- Connect the cables to the appropriate ports on the front of the cabinet monitor.
- Install the top cable bracket into the ISC.
Figure 2. ISC top cable bracket
| 1 | Top cable bracket |
| 2 | Screws |
- Install the four screws securing the top cable bracket to the ISC.
- Close the ISC doors.