Installs the center cover onto the right-hand side of the magnet.
Prerequisites
| Personnel requirements |
|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
|---|
| 2 | - | 10 minutes | - |
| Tools and test equipment |
|---|
| Item | Quantity | Part number | Manufacturer |
|---|
| Nonmagnetic Titanium Service Tool Kit, Small Set | 1 | 5113258 | - |
| Required conditions |
|---|
| Front cover is installed. |
Procedure
- Align the right-hand center cover with the magnet. Make sure the power switch is toward the front side of the magnet.
- Connect the M3379 cable connector to the enclosure LED switch J60.
- Connect the M3350 cable connector to the enclosure ambient temperature sensor.
- Install the cover onto the magnet and lower it into place.
- Install three M10 x 25 Socket Head Cap Screws
securing the cover to the magnet.
Figure 1. Right-hand center cover screws