• SIGNA™ Hero 3.0T Service Methods
  • 5852800-8EN Revision 1.0
  • Object ID: 00000018WIA30DDE970GYZ
  • Topic ID: id_2032884 Version: 1.9
  • Date: Jan 26, 2022 12:37:32 PM

Finalizing the 1-piece bridge replacement

This procedure finalizes the 1-piece bridge replacement.

Procedure

  1. Removing LOTO - ISC.
  2. Doing a check scan.
  3. Starting up the host computer.
  4. Make sure the scan setting is correct. See Setting the patient table scan range configuration.
  5. Make sure the cradle moves in and out smoothly.
  6. Do a cradle motion test. See Doing the cradle motion test.