• SIGNA™ Hero 3.0T Service Methods
  • 5852800-8EN Revision 1.0
  • Object ID: 00000018WIA303C1110GYZ
  • Topic ID: id_2003393 Version: 11.4
  • Date: Jul 7, 2021 3:51:55 PM

Installing the front endbell

Installs the front endbell onto the magnet.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-15 minutes-
Tools and test equipment
ItemQuantityPart numberManufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set15113258-
Required conditions
Front cover is installed.

About this task

Do the following tasks to complete installing the front endbell:
  • Installing the front endbell
  • Installing the table interface cover
  • Installing the magnet left- and right-hand lower access panels