• SIGNA™ Hero 3.0T Service Methods
  • 5852800-8EN Revision 1.0
  • Object ID: 00000018WIA30DFB230GYZ
  • Topic ID: id_15667323 Version: 1.9
  • Date: Jul 13, 2021 4:27:36 PM

Replacing the Global Operator Cabinet (GOC) Power Distribution Unit (PDU)

Removal and installation instructions for replacing the Power Distribution Unit (PDU) in the Global Operator Cabinet (GOC).

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-45 minutes30 minutes
Tools and test equipment
ItemQuantityPart numberManufacturer
Screwdriver1--
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.

Procedure