• SIGNA MR355 / SIGNA MR360
  • Service Manual
  • 5856356-3EN Revision 5.0
  • Basic Service Documentation. Copyright General Electric Company.
  • Object ID: 00000018WIA30EF5F20GYZ
  • Topic ID: id_13106913 Version: 1.1
  • Date: Jul 6, 2019 12:17:32 AM

Grounding and Leakage Current Checks

There are three procedures associated with checking grounding and leakage currents on a Signa system. Each procedure requiring different tools and test equipment, and should be performed in the sequence below. .

Ground Resistance Checks Should be Complete first

Next in line to be completed is Ground Leakage Current Test

PAC Assembly Leakage Current Test can be found here