• Object ID: 00000018WIA30518530GYZ
  • Topic ID: id_2011280 Version: 4.0
  • Date: Feb 24, 2021 1:55:47 AM

Installing the Integrated Control Engine (ICE)

Install the Integrated Control Engine (ICE) in the System Cabinet.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-30 minutes-
Tools and test equipment
ItemQuantityPart numberManufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set1 Kit5113258-
Nonmagnetic Titanium Service Tool Kit, Large Set5112581-
Replacement parts
ItemQuantityPart numberManufacturer
ICE1Refer to FRU manual-

Procedure

  1. Restore the clamps and tie wraps on the top of the ICE and connect the cables to the rear panel as shown below.
    Figure 1. Clamps, tie wraps, and rear connections
    1ICE rear panel connections
    2ICE top view, tie wraps for power cable
    3ICE top view, tie wraps for Ethernet cables
  2. Restore the ICE by reverse order.
    Figure 2. Power plug near Ethernet bracket
    Note: When you push the ICE into the ISC/PGR, be careful not to pinch the cables next to the chassis.
    Figure 3. Cables next to the chassis
    Note: Restore the cables as shown below. J numbers in orange need to be reconnected.
    Figure 4. Cable restoration
    Figure 5. Cable restoration of ICE with daughter board

    For a comprehensive list of cables and their connections, see the table with cable connections for various systems types in Table 5.