• Optima MR450w BASE 1.5T System Service Methods
  • 5690012-2EN Revision 3
  • Object ID: 00000018WIA307A0030GYZ
  • Topic ID: id_13106544 Version: 3.0
  • Date: Feb 24, 2021 1:50:46 AM

Replacing the Integrated Control Engine (ICE)

Removal and installation instructions for replacing the Integrated Control Engine (ICE) in the Integrated System Cabinet (ISC).

Prerequisites

The following tables represent a comprehensive roll-up of the personnel, time, tools, test equipment, and replacement parts you need to complete all possible tasks in this procedure.

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-60 minutes15 minutes
Tools and test equipment
ItemQuantityPart numberManufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set1 Kit5113258-
Nonmagnetic Titanium Service Tool Kit, Large Set5112581-
Replacement parts
ItemQuantityPart numberManufacturer
ICE1Refer to FRU manual-
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.