- SIGNA™ Hero 3.0T Service Methods
- 5852800-8EN Revision 1.0
- 00000018WIA30DA6410GYZ
- id_20044334.2
- May 12, 2021 4:08:44 PM
Testing MRU finalization
Procedure
- Make sure that any cable removed during testing has been re-connected and close MRU.
- Make sure there is continuity between the MRU and magnet by doing a heater test: