• SIGNA MR355 / SIGNA MR360
  • Service Manual
  • 5856356-3EN Revision 5.0
  • Basic Service Documentation. Copyright General Electric Company.
  • Object ID: 00000018WIA302E6E40GYZ
  • Topic ID: id_2020226 Version: 1.15
  • Date: Aug 6, 2020 5:29:08 AM

Schedule 2 Warranty Planned Maintenance

Site: ______________________Month:____________________
System ID#: ________________Dispatch/Job #: _____________
Service Engineer: ________________________________________

Estimated Test Time (Completing some checks in Parallel): 5 hours 47 minutes (with all options), 4 hours 47 minutes (without options)

Estimated Test Time (Completing some checks in Series): 5 hours 47 minutes (with all options), 4 hours 47 minutes (without options)

Software Revision Checks for Safety
PM CheckComments
Record Applications software version installed on the system
Record Service pack number installed on the system
Check compliance of the system Applications Software and Service Pack (Access DOC1667089 (SW Matrix) from the online documentation library)

Use the “ePM Form Data” tab to check and assess pass/fail criteria and actions.

Record Applications Software Revision from MR SW Matrix
Is the Applications Software Upgrade FMI Type "Safety"?Yes / NoSelect one of the options below:

Pass

Fail

FMI being deployed

Customer Refused / Postponed

Record Minimum Safety Service Pack from MR SW Matrix (or record "None")
Is there a safety service pack required per the SW Matrix?Yes / NoSelect one of the options below:

Pass

Fail

FMI being deployed

Customer Refused / Postponed

Product Option PM Check Test Purpose Est. Time Pass Fail Comments
Core System TasksReview Spotfire PM Healthpage (PM and System Helth sections) for System In-Spec Operation Summary. Short-link Log-in at: http://sc.ge.com/*MR PMImage Quality5
Core System TasksLVShim (PM Mode)Image Quality10
Core System TasksPatient Blower Fans & FilterFunctional Check20
Core System TasksPatient Monitor CheckFunctional Check30
Core System TasksPatient Table ChecksSafety40
Core System TasksClean MCS Heat ExchangerClean30
Core System TasksClean BRM ChillerClean30
Core System TasksClean BRM Chiller/4kw LCS Pump StrainerClean30
Core System TasksEmergency Off and Stop Circuits Indicator LightsSafety15
Core System TasksSave InfoSoftware10
Core System TasksSet TimeSoftware2
Core System TasksClean Dust FilterClean10
Core System TasksPerform Yearly service test for MRUSafety30
Core System TasksMDP; Verify that customer performed Battery Voltage Check (Sticker/Label with Date of Check on MDP)Status Check5
System Option Tasks (GE provided Options Only)Sentinelle Vanguard Breast MRI Table CheckSafety60
Equipment Operator Check (EOC)Equipment Operator Check (EOC): MRU Battery/LED (Old Quarterly)Service CheckSafety5

Schedule 2 Warranty Planned Maintenance.

Date Completed: ___________________________