Include all Schedule (B) Planned Maintenance
| Site: ______________________ | Month:____________________ |
| System ID#: ________________ | Dispatch/Job #: _____________ |
| Service Engineer: ________________________________________ | |
Estimated Test Time (Completing some checks in Parallel): 80 minutes (with all options), 20 minutes (without options)
Estimated Test Time (Completing some checks in Series): 80 minutes (with all options), 20 minutes (without options)
| Software Revision Checks for Safety | ||
|---|---|---|
| PM Check | Comments | |
| Record Applications software version installed on the system | ||
| Record Service pack number installed on the system | ||
| Check compliance of the system Applications Software and Service Pack (Access DOC1667089 (SW Matrix) from the online documentation library)
Use the “ePM Form Data” tab to check and assess pass/fail criteria and actions. | ||
| Record Applications Software Revision from MR SW Matrix | ||
| Is the Applications Software Upgrade FMI Type "Safety"? | Yes / No | Select one of the options below: Pass Fail FMI being deployed Customer Refused / Postponed |
| Record Minimum Safety Service Pack from MR SW Matrix (or record "None") | ||
| Is there a safety service pack required per the SW Matrix? | Yes / No | Select one of the options below: Pass Fail FMI being deployed Customer Refused / Postponed |
| Product Option | PM Check | Test Purpose | Est. Time | Pass | Fail | Comments |
|---|---|---|---|---|---|---|
| Core System Tasks | Review Spotfire PM Healthpage (PM and System Helth sections) for System In-Spec Operation Summary. Short-link Log-in at: http://sc.ge.com/*MR PM | Image Quality | 5 | |||
| System Option Tasks (GE provided Options Only) | Sentinelle Vanguard Breast MRI Table Check (Only when the System ID have the Table Patient Movement Option - Sentinelle Vanguard Breast MRI Table Option) | Safety | 60 | |||
| Equipment Operation Check (EOC) (Only for on site PM) | Equipment Operation Check (EOC): MRU battery/LED (Old Quarterly) Service Check | Magnet | 5 |
Schedule B Planned Maintenance.
Date Completed: ___________________________