Include all Schedule (C) Planned Maintenance

PM Schedule Sys_C

Site: ______________________Month:____________________
System ID#: ________________Dispatch/Job #: _____________
Service Engineer: ________________________________________

Estimated Test Time (Completing some checks in Parallel): 7 hours 24 minutes (with all options), 6 hours 24 minutes (without options)

Estimated Test Time (Completing some checks in Series): 7 hours 594 minutes (with all options), 6 hours 59 minutes (without options)

Software Revision Checks for Safety
PM CheckComments
Record Applications software version installed on the system
Record Service pack number installed on the system
Check compliance of the system Applications Software and Service Pack (Access DOC1667089 (SW Matrix) from the online documentation library)

Use the “ePM Form Data” tab to check and assess pass/fail criteria and actions.

Record Applications Software Revision from MR SW Matrix
Is the Applications Software Upgrade FMI Type "Safety"?Yes / NoSelect one of the options below:

Pass

Fail

FMI being deployed

Customer Refused / Postponed

Record Minimum Safety Service Pack from MR SW Matrix (or record "None")
Is there a safety service pack required per the SW Matrix?Yes / NoSelect one of the options below:

Pass

Fail

FMI being deployed

Customer Refused / Postponed

Product option PM Check Test Purpose Est. TimePass Fail Comments
Core System TasksReview Spotfire PM Healthpage (PM and System Helth sections) for System In-Spec Operation Summary. Short-link Log-in at: http://sc.ge.com/*MR PMImage Quality5
Core System TasksAlignment Light CheckImage Quality15
Core System TasksSPT (PM Mode)
Note: SPT takes approximately 60 minutes. Complete the following tasks in parallel during SPT.

- MCS/LCS/BRM Chiller Coolant Level Check.

- Check Noise Level and Leakage

- Verify that customer erformed MDP Power and Ground Connection Check

Image Quality60
Core System TasksLVShim (PM Mode)Image Quality10
Core System TasksEPI White Pixel (PM Mode)Image Quality10
Core System TasksPM CheckImage Quality5
Core System TasksPatient Blower Fans & FilterFunctional Check20
Core System TasksPneumatic Patient Alert SystemSafety5
Core System TasksPatient Table ChecksFunctional Check40
Core System TasksMCS/LCS/BRM Chiller Coolant Level CheckFunctional Check10
Core System TasksClean MCS Heat ExchangerClean30
Core System TasksClean BRM ChillerClean30
Core System TasksClean BRM Chiller/4kw LCS Pump StrainerClean30
Core System TasksCabinet FAN & Water LineFunctional Check15
Core System TasksCheck Noise Level and LeakageFunctional Check20
Core System TasksEmergency Off and Stop Circuits Indicator LightsSafety15
Core System TasksStore logSoftware2
Core System TasksSave InfoSoftware10
Core System TasksSet TimeSoftware2
Core System TasksClean Dust FilterClean10
Core System TasksPAC Leakage Current TestSafety10
Core System TasksPerform Yearly service test for MRUSafety30
Core System TasksInspect Cryocooler SystemsFunctional Check5
Core System TasksMDP; Confirm customer performed Battery Voltage Check (Sticker/Label with Date of Check on MDP)Status Check5
Core System TasksMDP; Verify customer performed MDP Power and Ground Connection Check (Sticker/Label with Date of Check on MDP)Status Check5
System Option Tasks (GE provided Options Only)Sentinelle Vanguard Breast MRI Table Check
Note: If no Sentinelle Vanguard Breast MRI Table option, leave blank, or put "Not Applicable" in comments.
Safety60
Equipment Operation Check (EOC)Equipment Operation Check (EOC): MRU Battery/LED (Old Quarterly) Service CheckSafety5

Schedule C Planned Maintenance.

Date Completed: ___________________________