• SIGNA MR355 / SIGNA MR360
  • Service Manual
  • 5856356-3EN Revision 5.0
  • Basic Service Documentation. Copyright General Electric Company.
  • Object ID: 00000018WIA3065BF20GYZ
  • Topic ID: id_13106580 Version: 1.27
  • Date: Sep 23, 2020 11:11:15 PM

Include all Schedule (D) Planned Maintenance

Site: ______________________Month:____________________
System ID#: ________________Dispatch/Job #: _____________
Service Engineer: ________________________________________

Estimated Test Time (Completing some checks in Parallel): 80 minutes (with all options), 20 minutes (without options)

Estimated Test Time (Completing some checks in Series): 80 minutes (with all options), 20 minutes (without options)

Software Revision Checks for Safety
PM CheckComments
Record Applications software version installed on the system
Record Service pack number installed on the system
Check compliance of the system Applications Software and Service Pack (Access DOC1667089 (SW Matrix) from the online documentation library)

Use the “ePM Form Data” tab to check and assess pass/fail criteria and actions.

Record Applications Software Revision from MR SW Matrix
Is the Applications Software Upgrade FMI Type "Safety"?Yes / NoSelect one of the options below:

Pass

Fail

FMI being deployed

Customer Refused / Postponed

Record Minimum Safety Service Pack from MR SW Matrix (or record "None")
Is there a safety service pack required per the SW Matrix?Yes / NoSelect one of the options below:

Pass

Fail

FMI being deployed

Customer Refused / Postponed

Product Option PM Check Test Purpose Est. time Pass Fail Comments
Core System TasksReview Spotfire PM Healthpage (PM and System Helth sections) for System In-Spec Operation Summary. Short-link Log-in at: http://sc.ge.com/*MR PMImage Quality5
System Option Tasks (GE provided Options Only)Sentinelle Vanguard Breast MRI Table Check (Only when the System ID have the Table Patient Movement Option - Sentinelle Vanguard Breast MRI Table Option)Safety60
Equipment Operator Check (EOC) (Only for on site PM)Equipment Operator Check (EOC): MRU Battery/LED (Old Quarterly) Service CheckMagnet5

Schedule D Planned Maintenance.

Date Completed: ___________________________