Include all Schedule (A) Planned Maintenance
| Site: ______________________ | Month:____________________ |
| System ID#: ________________ | Dispatch/Job #: _____________ |
| Service Engineer: ________________________________________ | |
Estimated Test Time (Completing some checks in parallel): 8 hours 10 minutes (with all options), 6 hours 35 minutes (without options)
Estimated Test Time (Completing some checks in series): 8 hours 45 minutes (with all options), 6 hours 35 minutes (without options)
| Software Revision Checks for Safety | ||
|---|---|---|
| PM Check | Comments | |
| Record Applications software version installed on the system | ||
| Record Service pack number installed on the system | ||
| Check compliance of the system Applications Software and Service Pack (Access DOC1667089 (SW Matrix) from the online documentation library)
Use the “ePM Form Data” tab to check and assess pass/fail criteria and actions. | ||
| Record Applications Software Revision from MR SW Matrix | ||
| Is the Applications Software Upgrade FMI Type "Safety"? | Yes / No | Select one of the options below: Pass Fail FMI being deployed Customer Refused / Postponed |
| Record Minimum Safety Service Pack from MR SW Matrix (or record "None") | ||
| Is there a safety service pack required per the SW Matrix? | Yes / No | Select one of the options below: Pass Fail FMI being deployed Customer Refused / Postponed |
| Product Option | PM Check | Test Purpose | Est. Time | Pass | Fail | Comments |
|---|---|---|---|---|---|---|
| Core System Tasks | Review Spotfire PM Healthpage (PM and System Helth sections) for System In-Spec Operation Summary. Short-link Log-in at: http://sc.ge.com/*MR PM | Image Quality | 5 | |||
| Core System Tasks | SPT (PM Mode) Note: SPT takes approximately 60 minutes. Complete the following tasks in parallel during SPT. - MCS/LCS/BRM Chiller Coolant Level Check. - Check Noise Level and Leakage - Verify that customer erformed MDP Power and Ground Connection Check | Image Quality | 60 | |||
| Core System Tasks | LVShim (PM Mode) | Image Quality | 10 | |||
| Core System Tasks | EPI White Pixel (PM Mode) | Image Quality | 10 | |||
| Core System Tasks | PM Check | Image Quality | 5 | |||
| Core System Tasks | Patient Blower Fans & Filter | Functional Check | 20 | |||
| Core System Tasks | Gradient Cable Connection Check | Functional Check | 15 | |||
| Core System Tasks | Pneumatic Patient Alert System | Safety | 5 | |||
| Core System Tasks | Power Monitor Check | Functional Check | 30 | |||
| Core System Tasks | Patient Table Checks | Safety | 40 | |||
| Core System Tasks | MCS/LCS/BRM Chiller Coolant Level Check | Functional Check | 10 | |||
| Core System Tasks | Cabinet FAN & Water Line | Functional Check | 15 | |||
| Core System Tasks | Check Noise Level and Leakage | Functional Check | 20 | |||
| Core System Tasks | PDU Power and Ground Connection Checks | Functional Check | 30 | |||
| Core System Tasks | Emergency Off and Stop Circuits Indicator Lights | Safety | 15 | |||
| Core System Tasks | Save Info | Software | 10 | |||
| Core System Tasks | Clean Dust Filter | Clean | 10 | |||
| Core System Tasks | Inspect Cryocooler Systems | Functional Check | 5 | |||
| Core System Tasks | Inspect Cryocooler Vent | Functional Check | 10 | |||
| Core System Tasks | If equippend with remote MRU, visually inspect cable connections between remote MRU and primary MRU | Safety | 5 | |||
| Core System Tasks | MDP; Verify customer performed MDP Power and Ground Connection Check (Sticker/Label with Date of Check on MDP) | Status Check | 5 | |||
| System Option Tasks | Operation of Oxygen Monitor. Note: Perform if present and included in GE service contract. If option not present, leave blank and "Not Applicable" in comment. Or, if kit is not available, mark "Fail" and Comment "Incomplete-No Kit". | Safety | 30 | |||
| System Option Tasks | Sentinelle Vanguard Breast MRI Table Check. Note: If no Sentinelle Vanguard Breast MRI Table option, leave blank, or put "Not Applicable" in comments. | Safety | 60 | |||
| Equipment Operation Check (EOC) | Equipment Operation Check (EOC): MRU Battery/LED (Old Quarterly) Service Check. | Safety | 5 |
Schedule A Planned Maintenance.