- 00000018WIA30421730GYZ
- id_20120333.0
- Dec 18, 2019 2:57:07 AM
Finalizing the Integrated Control Engine (ICE) fan assembly replacement
This procedure finalizes the Integrated Control Engine (ICE) fan assembly replacement.
Prerequisites
| Personnel requirements | |||
|---|---|---|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
| 1 | - | 15 minutes | - |