Testing lead-to-ground with the Fluke ESA612 Safety Analyzer
About this task
Procedure
Select μA to start the leakage test.
Select F4 (More...).
Select F1 (Select).
On the display, Patient should be highlighted. The display shows polarity as Reverse, neutral is closed, earth is closed.
Press ▼ (down arrow) to select DC Only.
Press ► (right arrow) to select the lead connection to test.
The lead under test will be highlighted.
Measure all four leads and verify that the leakage current displayed on the meter is less than 50 microamps. Record the values on the data sheet (see PAC leakage current measurements.
Press Polarity until the display shows polarity as Normal, neutral is closed, earth is closed.
Measure and record the values for the four leads again.
Select F2 (Mains on A.P.).
The display shows Push Test: Normal.
Press Test, and verify that the leakage current displayed on the meter is less than 50 microamps. Record the values on the data sheet (M.A.P. Isolation Tests).
The display now shows Push Test: Reverse.
Press Test, and verify that the leakage current displayed on the meter is less than 50 microamps. Record the values on the data sheet (M.A.P. Isolation Tests).