• Discovery MR750 3.0T System Service Methods
  • 5690009-2EN Revision 4
  • Object ID: 00000018WIA309FC410GYZ
  • Topic ID: id_2004459 Version: 6.1
  • Date: Jul 13, 2021 4:10:15 PM

Cleaning and replacing P-port receptacles (ODU connectors)

The P-Port receptacle must be cleaned and lubricated on each of the system P-ports.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-5 minutes per connector to clean and lubricate; 30 minutes to replace-
Tools and test equipment
ItemQuantityPart numberManufacturer
Latex-Free Nitrile Gloves (8 mil)1 pair46-194427P400-
Spindle Tip Replacement Kit, ODU P-Port Plug Tool15150668-33-
Safety Shoes1 pair--
Safety Glasses1--
2 mm Allen Wrench1--
Consumables
ItemQuantityPart numberManufacturer
P-Port Spindle Lubrication Kit15150668-32-
HDv P-Port Replacement Spindle Tip Kit15150668-31-
Cotton SwabsAs required--
Soft ClothsAs required--
Required conditions
Order the lubricant kit prior to starting this procedure.
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.

About this task

The P-Port receptacle must be cleaned and lubricated on each of the system P-ports (P1 and P2 on the LPCA and P3 and P4 on the 32-channel table). Also, the coil connector must be cleaned and tested for proper fit to each P-port receptacle.