- Discovery MR750w and SIGNA™ Architect T 3.0T System Service Methods
- 5690002-2EN Revision 4
- 00000018WIA30E21130GYZ
- id_123740151.12
- Oct 11, 2021 3:47:42 PM
Replacing table electrical docking mechanism components
Removes table components related to electrical docking and installs replacement components.
Prerequisites
| Personnel requirements | |||
|---|---|---|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
| 1 | - | 60 minutes | - |
| Tools and test equipment | |||
|---|---|---|---|
| Item | Quantity | Part number | Manufacturer |
| Nonmagnetic Titanium Service Tool Kit, Small Set | 1 | 5113258 | - |
| Replacement parts | |||
|---|---|---|---|
| Item | Quantity | Part number | Manufacturer |
| Link Bar Connector Pedal | 1 | 5174518 | - |
| Link Rod Connector Kit | 1 | 5769330-2 (GEM) 5769330 (Non-GEM) | - |
| Shaft Rocker | 2 | 5147700-2 (GEM) 5147700 (Non-GEM) | - |
| Rocker Clamp | 2 | 5392170 (GEM) 5147701 (Non-GEM) | - |
| Safety |
|---|
|
Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:
If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed. |
Please choose from the following: