- SIGNA MR355 / SIGNA MR360
- Service Manual
- 5856356-3EN Revision 5.0
- Basic Service Documentation. Copyright General Electric Company.
- 00000018WHA309BABGYZ
- id_20022124.0
- Oct 9, 2019 5:14:30 PM
Doing an Image Compute Node (ICN) process verification test
This diagnostic tests to make sure the correct number of processes (such as recon, acquisition) are running on an ICN.
Purpose
This diagnostic tests to make sure the correct number of processes (such as recon, acquisition) are running on an ICN. This diagnostic uses a configuration file that specifies the process name and the number of instances that should be running on the ICN.
Components tested
- Processes running on the ICN
Test sequence
- Select ICN Process Verification.
- Click Run.
- Make sure each ICN passes.
Results
| Result | Description | GE Field Action |
| Passed | The ICN has passed the diagnostic | No further action required. |
| Failed | The ICN has failed the diagnostic |
|
