Replace the PS filter box in the Integrated System Cabinet (ISC) Penetration Wall (PW).
Prerequisites
| Personnel requirements |
|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
|---|
| 1 | - | 30 minutes | 15 minutes |
| Tools and test equipment |
|---|
| Item | Quantity | Part number | Manufacturer |
|---|
| Digital Voltmeter (DVM) | 1 | 46-194427P284 | - |
| Red Warning LOTO Tag | 2 | 46-194427P322 | - |
| Multi-Locking Device (if multiple service personnel are involved) | 1 | 46-194427P313 | - |
| Red LOTO Personal Lock Wrap | 2 | 2393068 | - |
| Brass Master Padlock with Brass Shackle | 2 | 46-194427P320 | - |
| Nonmagnetic Titanium Service Tool Kit, Small Set | 1 | 5113258 | - |
| Replacement parts |
|---|
| Item | Quantity | Part number | Manufacturer |
|---|
| ISC Penetration Wall Filter Box | 1 | 6859100 | - |
| Safety |
|---|
|
Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:
- Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
- Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
- Comply with all site-specific training and workplace safety requirements.
If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.
|