• Discovery MR750 3.0T System Service Methods
  • 5690009-2EN Revision 4
  • Object ID: 00000018WIA30C9A260GYZ
  • Topic ID: id_2029622 Version: 1.2
  • Date: Nov 19, 2020 8:31:52 AM

Replacing the 48V Integrated Control Engine (ICE) DC Power Supply (DCPS)

Removes the ICE DCPS and installs a replacement ICE DCPS into the Power Gradient RF (PGR) cabinet.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-10 minutes-
Tools and test equipment
ItemQuantityPart numberManufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set15113258-
Replacement parts
ItemQuantityPart numberManufacturer
DC PS Assembly for ICE15746064-
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.