- Discovery MR750 3.0T System Service Methods
- 5690009-2EN Revision 4
- 00000018WIA306A0030GYZ
- id_131064384.1
- Jul 13, 2021 7:09:35 PM
Replacing the Integrated Control Engine (ICE) fan assembly
Removal and installation instructions for replacing the Integrated Control Engine (ICE) fan assembly in the Integrated System Cabinet (ISC).
Prerequisites
The following tables represent a comprehensive roll-up of the personnel, time, tools, test equipment, and replacement parts you need to complete all possible tasks in this procedure.
| Personnel requirements | |||
|---|---|---|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
| 1 | - | 15 minutes | 15 minutes |
| Tools and test equipment | |||
|---|---|---|---|
| Item | Quantity | Part number | Manufacturer |
| Nonmagnetic Titanium Service Tool Kit, Small Set | 1 Kit | 5113258 | - |
| Nonmagnetic Titanium Service Tool Kit, Large Set | 5112581 | - | |
| Replacement parts | |||
|---|---|---|---|
| Item | Quantity | Part number | Manufacturer |
| ICE Fan Assembly | 2 | Refer to FRU Manual | - |
| Safety | ||||
|---|---|---|---|---|
|
Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:
If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed. | ||||
| ||||
Note: The ICE unit can be withdrawn with a slide rail.