- Discovery MR750 3.0T System Service Methods
- 5690009-2EN Revision 4
- 00000018WIA30E31E20GYZ
- id_131064557.1
- Oct 11, 2021 6:13:21 PM
Setting up and calibrating UPM - MNS
Sets up and calibrates Universal Power Monitor (UPM) and Multi-Nuclear Spectroscopy (MNS) components.
Prerequisites
| Personnel requirements | |||
|---|---|---|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
| 1 | - | 30 minutes | 5 minutes |
| Tools and test equipment | |||
|---|---|---|---|
| Item | Quantity | Part number | Manufacturer |
| RF Power Measurement Kit | 1 |
Either 5307511-2 or 5307511-3 (Bird wattmeter) | - |
| Digital Multimeter | 1 | 46-194427P84 | - |
| 3.0T 31P T/R Switch (available on site with customer) | 1 |
2354050 (non-RoHS) 5409918 (RoHS) | - |
| Safety | ||||
|---|---|---|---|---|
|
Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:
If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed. | ||||
| ||||
About this task
The AMT amplifier has cable connections at the rear of the cabinet. The CPC amplifier has cable connections at the top of the cabinet.
If you are replacing a UPM board only (rather than performing a full MNS setup), start with Setting up software tool to calibrate UPM - MNS forward power.